Hello, welcome to visit Dongguan huada machinery co. LTD site!

About Us | Contact Us | Feedback | Site Map

Product Categories
News

 

Contact: Mr. Zhou (Business Manager)

Tel: 0769-83350969

Phone: 13829119477

Fax:86 0769 85623822

Address: a district rhinoceros Pei Yuen Kong Road, Dalang Town, Dongguan City, Guangdong, China Wu Xiang 56

Post Code: 523100

Main Products

Automatic cleaning + heat + screw conveyor combination (cooking pot)

You are here:Home > Products > PET.PP bottle washing line > Automatic cleaning + heat + screw conveyor combination (cooking pot)

Automatic cleaning + heat + screw conveyor combination (cooking pot)

Automatic cleaning + heat + screw conveyor combination (cooking pot)

Details

Automatic cleaning + heat + screw conveyor combination (cooking pot) Maintenance:
1, the inlet and outlet pipe fittings steam leakage, tighten the nut when elected not solve the problem, you should add or replace the packing.
2, pressure gauge and safety valve should be checked regularly and, if failure timely replacement and repair.
3, after the gear box started 50 hours, should be removed to release the oil, flush with kerosene or diesel oil, add 30 # - 40 # clean and oil, using 150 hours after the second oil change, depending on the particular circumstances after , with each oil change to 1000 hours once.
4, anti-rust oil peeling, brushing should be timely, coated outer pot of paint, we recommend using X55-3 aluminum vinyl waterproof paint.
5, using the pan after 5 years is recommended for safety pressure test, carried out after the interval hydrostatic test, as required throughout the technology sector performed.

Automatic cleaning + heat + screw conveyor combination (cooking pot) Caution:
1, using the vapor pressure shall not exceed the fixed working pressure for a long time.
2, into the steam inlet valve should be opened slowly until the required pressure up, shut-off valve at the outlet of the condensate, if fitted trap, the valve should always be open; If no trap, the first valve open until then when the overflow valve steam off a small, open a small amount of water vapor in the degree to keep overflows.
3, the safety valve can be used according to the user's own vapor pressure, self-adjusting.
4, steam pot during use, should always pay attention to changes in vapor pressure, with inlet valve adjust.
5, after stopping the intake should pot straight cock mouth open, put the finish I water.
6, tilting and stirring cooking pot before class use, should in all rotating parts refueling; stirring cooking pot on the part of decent pot, cooked vegetable oil is recommended; others are used throughout the 30 # - 40 # machinery oil.

 

Previous [Tool Type]      Next [Dehumidifiers]

Navigation

more +

Home | Company Profile | Products | Contact Us | Recruitment | Site Map |

Copyright:Dongguan DaLingshan Huada Plastic Machinery Factory Contact:Mr.Zhou Phone:0769-83350969

Tel:13829119477 Fax:0769-85623822 Address:Dalang Town, Dongguan City, Guangdong, China Wu Xiang rhino slope of a District 56
Zip Code:523100 Technical support:Hangzhou Xisi